Optimum Customer Service Level and Cost to Serve    
IV   SD Fcst Err (Back order cost is "per unit short". CSL = Line Fill)  
HR EOQ Lead Time   How to use this spreadsheet  
OQ SD Lt Err   Enter the relevant values in the table at the top left side.  
OC Optimum Use the Tab key to trigger recalculation  
AD C. Serv = If an OQ is entered as 0, the EOQ will be used.  
BO (Basis of order lines)   NOTE: If EOQ is used, stock and order costs are the same  
BO is cost per unit short Total Cost    
 
 

Powered By ExcelEverywhere